Published on SOMOS Consulting (http://www.somos.com)
EVMS GL 17

Guideline

When a work breakdown structure is used, summarize direct costs from control accounts into the work breakdown structure without allocation of a single control account to two or more work breakdown structure elements.

Interpretation


Source URL (retrieved on 2008-10-10 17:04): http://www.somos.com/evmsguide/gl17